Rectification of SF by-pass into WWTP

Remove the red lid from the SF inflow pipe. This operation is carried out after the maturing period of WWTP (i.e. aprox. after 3 weeks of WWTP activity – water on outflow has to be pure).

Put on the red lid onto the SF inflow pipe. This operation is carried out in the case of the cracked SF.